
Connectivity Engineer, Leased - Data Center Construction
Meta
senior-data-center-electrical-engineer
data-center-engineer
network-infrastructure-engineer
senior-network-infrastructure-engineer
network-infrastructure
data-center
project-management
google-workspace
fiber-optic
ai
primavera
quality-assurance
Job details
- Company
- Meta
- Location
- United States
- Remote
- Yes
- Salary
- $123,000 - $176,000
- Field
- DevOps
- Source
- via Himalayas
Posted
April 24, 2026
Is the job expired?
About this role
Meta is seeking a Connectivity Engineer to join the Design Engineering and Construction (DEC) team to provide site level support and ensure DEC telecommunication projects are executed on schedule, within budget, and at the level of quality specified.
Requirements
- 5+ years experience in project management
- Experience engaging and guiding stakeholders
- Experience providing solutions to construction related problems
- Experience with Google Workspace
- Experience in leading deployments of Network/Structure cabling infrastructure
- Experience reviewing and leading installations to design documents and specifications
- Data center development and/or construction management experience
- Experience with fiber optic testing at scale, inclusive of complex troubleshooting
- Experience with Primavera 6
- Experience managing IT or IP Network deployment projects in a mission critical environment requiring coordination across multiple disciplines for the delivery of a common goal
- Experience with outside plant cabling (OSP) deployments including OTDR/OLTS testing
- Experience with Quality Assurance and Quality Control, including progressive inspections and acceptance
- Demonstrated ability to integrate AI tools to optimize/redesign workflows and drive measurable impact (e.g., efficiency gains, quality improvements)
- Experience adhering to and implementing responsible, ethical AI practices (e.g., risk assessment, bias mitigation, quality and accuracy reviews)
- Demonstrated ongoing AI skill development (e.g., prompt/context engineering, agent orchestration) and staying current with emerging AI technologies
Benefits
- Health insurance
- Retirement plan
- Bonus
- Equity
- Paid time off
- Other benefits
Originally posted on Himalayas
Similar jobs
Quality Assurance Lead
NeuraFlash·
United States·
Remote
3d ago
DevOps
quality-assurance-lead
sdet
test-automation
via Himalayas
3d ago

Senior Network Infrastructure Engineer
NVIDIA·
India·
Remote
1w ago
DevOps
senior-network-infrastructure-engineer
senior-ip-network-engineer
senior-network-engineer
via Himalayas
1w ago

Technology Architect - Cloud Consulting
Accenture·
Frankfurt am Main
1w ago
DevOps
project-management
cloud
architecture
via Arbeitnow
π©πͺDE
1w ago